Park Peres

Park Peres
Location: 
Holon
Description: 

Location: Holon

Customer: Recreation and Entertainment (Holon) Ltd.

Target: Construction of Peres Park and renovation of its boating canal

Time of undertaking: 2014-2015

Background:

The Holon city company decided to build a new sports center and commercial center. This necessitated development work, including earthworks, drainage, water lines, parking, a bus terminal, sidewalks, lighting systems, irrigation systems and landscape. In addition, a 4500 square meter boating canal was renovated.

The Challenge

The project was done in stages, with many of its areas constantly open to the public. Special safety conditions needed to be put in place in order to protect the public, especially during work in the winter and on the 35,000 square meter parking lot. Moreover, the renovation of the boating canal turned out to be a complex project, integrating the restoration of concrete structures, waterproofing, underwater ceramic floor tile installation and intricate new water systems with pumps, filters, lighting and fountains.

The Solution

The Green Way management team supervised a multitude of workers, sub-contractors and suppliers, coordinating a finely-tuned management program and allowing for simultaneous work in a variety of tasks, e.g. dismantling, extensive earthworks, fencing, walls, drainage and water systems, sidewalks, stairs, irrigation systems, planting, and much more.

The boating canal required expert foreign workers who dismantled the old waterproof lining, renovated the concrete, the waterfall, replaced water systems and waterproofing, architectural stone covering, lighting systems, ceramic tiling with epoxy mortar, special filtering system and more.